Unbonded prestressing works for the north and south concourses of the T2 terminal. The 255,000 m² terminal uses prestressed floor and beam structures from levels 2 to 4, with approximately 450 t of strand.

Fuzhou Changle International Airport Phase II T2 Terminal Prestressing Works · Fuzhou, Fujian, China

Terminal floor area
Approximately 255,000 m²
Prestressing zones
Level 2 to level 4 floors and beams
Project scope
T2 north and south concourses
Tendon system
Unbonded Ø15.2 mm, 1860 MPa low-relaxation strand
Prestressing quantity
Approximately 450 t
Structural conditions
Large span and extra-long dimensions

Engineering requirements

Tendons extend across floors and beams on levels 2 to 4 of both concourses. Multiple work fronts, congested reinforcement and closure strips require coordinated installation and stressing, including concrete-strength requirements at closure strips.

Project scope

The work included tendon profiling for beams and slabs, coordination with dense reinforcement, anchorage layout, staged installation and stressing across multiple concourse work fronts.

Project application

Unbonded prestressing serves the terminal's long-span and extended floor and beam structures. The project experience covers tendon installation across multiple levels and work fronts, together with stressing arrangements associated with closure strips. Photographs identify tendon positioning and anchorage details requiring construction-stage coordination.