Prestressing Cost Comparison

Compare preliminary RC and PT options using steel quantities, direct costs and cost per square metre before detailed drawings are available.

Basic Parameters

Unit Rates

Preliminary comparisons use all-in rebar and strand rates. Anchorages, ducts, stressing, grouting and concrete are not priced separately.

Reinforcement Input

Reinforced concrete option

Each row: name | number of bars | diameter (mm) | length per bar (m) | unit mass (kg/m). If blank, unit mass is calculated as d² × 0.00617.

Rebar in the prestressed option

Include bottom bars, support bars and additional reinforcement retained in the PT option.

Prestressing strands

Each row: name | tendon count | strands per tendon | tendon length (m) | unit mass (kg/m). For 15.2 mm strand, 1.101 kg/m may be used.
Back to Prestressing Design