External Prestressing Strengthening Collaboration under SS EN / MS EN (Singapore & Malaysia)
Providing external prestressing strengthening assessment and design support for load changes, collaborating with local QP and consultants under SS EN/MS EN standards.

Assessment Timing and Conditions
External prestressing strengthening applies when structural capacity is insufficient or load changes occur. Assessment requires site inspection data and design documents to determine necessity and feasibility.
Anchorage and Deviator Space Requirements
Design must consider adequate space for anchorage and deviators to ensure ease of installation and structural safety. Space constraints require coordination with local design teams.
Inspection and Maintenance Access Design
External prestressing systems require inspection and maintenance access provisions for long-term monitoring and repair. Designs must comply with local regulations and safety standards.
Collaboration with Local Registered Parties
FABR collaborates closely with Singapore/Malaysia registered consultants and QPs to ensure designs comply with SS EN/MS EN, with statutory responsibility held locally.
Technical Support and Scheme Optimization
Provide external prestressing design calculations and detailing advice to support local teams in optimizing schemes, improving strengthening effectiveness and construction efficiency.
Discuss an engineering issue